1 |
- |
Below-grade Construction; Foundation system and basement |
- |
2 |
- |
Concrete Details; Cast-in-place concrete, precast concrete |
- |
3 |
- |
Floor System Design; Floor deck design, openings, methods and matarials of construction |
- |
4 |
- |
Masonry and Concrete Bearing Wall Construction; Wall assembly, openings, materials, support, joints |
- |
5 |
- |
Wood Light Frame Construction; Baloon frame and platform frame systems, structural sheathing, connections |
- |
6 |
- |
Steel Frame Construction; Material, members, connections, construction method |
- |
7 |
- |
Roof Construction; Trusses, rafters, sheathing |
- |
8 |
- |
MID-TERM EXAM |
- |
9 |
- |
Wall Finishing; Veneer with various materials (stone, metal, tile, etc.) |
- |
10 |
- |
Door & Window; Lintel, window sill, framing details |
- |
11 |
- |
Floor Coverings; Ceramic tiling, stone and wood covering |
- |
12 |
- |
Staircase; Stairwell design including elevator, landing and handrail standards |
- |
13 |
- |
Wet Area Design; Restroom, bath, kitchen, etc. |
- |
14 |
- |
Ceilings and Interior Partitioning; False ceiling, partition wall, MEP considerations through ceiling and partition walls |
- |
15 |
- |
General Review |
- |
16 |
- |
FINAL EXAM |
- |
17 |
- |
FINAL EXAM |
- |