| 1 |
- |
Establishment Studies and Facility Planning |
- |
| 2 |
- |
Establishment Studies and Facility Planning (continued) |
- |
| 3 |
- |
Material Movement (Internal Transport)/Handling Function and Equipment |
- |
| 4 |
- |
Material Movement Expenses and Facility Design |
- |
| 5 |
- |
Facility Design Process and Collection of Information |
- |
| 6 |
- |
Solving the Problem: Material Flow and Activity Relationship Analysis |
- |
| 7 |
- |
Solving the Problem: Material Flow and Activity Relationship Analysis (continued) |
- |
| 8 |
- |
Calculating the Number of Machines and Determining Space Requirements |
- |
| 9 |
- |
Researching Plan Options |
- |
| 10 |
- |
MID-TERM EXAM |
- |
| 11 |
- |
Comparison, Selection and Application of Plan Options |
- |
| 12 |
- |
Graphical Models and Techniques Based on All Products |
- |
| 13 |
- |
Graphical Models and Techniques Based on All Products (continued) |
- |
| 14 |
- |
Mathematical Models and Techniques Based on All Products |
- |
| 15 |
- |
Computer Solved Intuitive Models and Techniques (Craft, Corelap, Aldep, etc.) |
- |
| 16 |
- |
FINAL EXAM |
- |
| 17 |
- |
FINAL EXAM |
- |